Day: 28 October 2016

Changes to Henley Hall solar farm access thrown out giving residents some tranquility

Plans for a solar farm at Henley Hall on the outskirts of Ludlow were approved in June after an appeal to the planning inspectorate. In September, the size of the solar farm was reduced. But at the same time, Kronos Solar said it wanted construction traffic to access the site near to housing at Lower Ledwyche. The original plan had been to access the solar farm via an existing concrete track well away from housing. Nearby residents were quite rightly furious with the plans, which would have caused considerable local disruption.

Back to top